Major Projects

Riyadh Power Plant No.9 Combined Cycle (5,980 MW)

The combined cycle plant (PP9) has been built on a site of 3.2 million square meter about 54km east of Riyadh. This construction, together with an expansion of the existing PP 9 facility, made Riyadh the largest crude oil-fired power plant in the world. Arabian Bemco Contracting Company was awarded the project by SEC. Works Started in 1995,

Riyadh Power Plant No.10 Combined Cyle (4,600 MW)

On June 30, 2008 Arabian Bemco was awarded a S.R 11 billion (USD 3 billion) contract with SEC for a turnkey supply and installationof a 2,600 MW power geneartion plant (PP10) built on an area of 5 million square meter outside the capital of Saudi Arabia, Riyadh.This is a Greenfield project that will initially install 36 GTG simple cycle base loaded gas turbines on

Qurayyah Combined Cycle Project (4,600 MW)

On June 11, 2007, Arabian Bemco was awarded a SR 2.1 billion (USD 570 Million) contract with SEC to build the 2,500 MW Qurrayah Open Cycle Power Plant in the Eastern Province of KSA. Under the engineering, civil construction and mechanical erection package, Arabian Bemco will install gas-fired turbines at the plant supplied by

Riyadh Power Plant No.12 Combined Cycle (2,175 MW)

On May 16, 2012, Arabian Bemco signed a S.R 4.7 billion contract (USD 1.3 billion) with the Saudi Electricity Company to build a Grass Root Combined Cycle Power Plant in Riyadh, Saudi Arabia. The plant is located 100 KM West of Riyadh City. Once completed, the new grass root combined cycle power plant (PP12) will produce


Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description
Relocation of four (4) GTG Units from Power Plant No. 10 to Qassim Power Plant

Scope of Work
The scope of works include engineering, design, procurement, supply, deliver materials and equipment, install, erect, construct, test and commission new four (4) Gas Turbines and all associated Auxiliaries, B.O.P, from the new Power Plant No. 10 to Qassim Power Plant including supply of new two (2) thee winding Generator Transformers, DC, UPS System, Unit MV Switchgear, 4.16 kV Switchgear, Station 480 V Switchgear, MV & LV Cables, 132 kV Cable System including Protection & Control, Compressed Air Systems, SCADA Interface & Remote Alarm Indication, Fire Alarm & Fire Fighting System, HVAC System, Construction of new 20,000 m3 Crude Oil Storage Tank with all associated Auxiliaries and perform all Substation Works to connect the new four (4) GTG Units with the provision of future Turbine Inlet Air Cooling System.

Qassim, KSA
218 Millions
SEC-COA
Aug 8, 09 To Jul 30, 10
POWER GENERATION & TRANSMISSION
SEC and Saudi Consult