Major Projects

Riyadh Power Plant No.9 Combined Cycle (5,980 MW)

The combined cycle plant (PP9) has been built on a site of 3.2 million square meter about 54km east of Riyadh. This construction, together with an expansion of the existing PP 9 facility, made Riyadh the largest crude oil-fired power plant in the world. Arabian Bemco Contracting Company was awarded the project by SEC. Works Started in 1995,

Riyadh Power Plant No.10 Combined Cyle (4,600 MW)

On June 30, 2008 Arabian Bemco was awarded a S.R 11 billion (USD 3 billion) contract with SEC for a turnkey supply and installationof a 2,600 MW power geneartion plant (PP10) built on an area of 5 million square meter outside the capital of Saudi Arabia, Riyadh.This is a Greenfield project that will initially install 36 GTG simple cycle base loaded gas turbines on

Qurayyah Combined Cycle Project (4,600 MW)

On June 11, 2007, Arabian Bemco was awarded a SR 2.1 billion (USD 570 Million) contract with SEC to build the 2,500 MW Qurrayah Open Cycle Power Plant in the Eastern Province of KSA. Under the engineering, civil construction and mechanical erection package, Arabian Bemco will install gas-fired turbines at the plant supplied by

Riyadh Power Plant No.12 Combined Cycle (2,175 MW)

On May 16, 2012, Arabian Bemco signed a S.R 4.7 billion contract (USD 1.3 billion) with the Saudi Electricity Company to build a Grass Root Combined Cycle Power Plant in Riyadh, Saudi Arabia. The plant is located 100 KM West of Riyadh City. Once completed, the new grass root combined cycle power plant (PP12) will produce


Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description
LSTK scope of work shall include but not be limited to engineering, design, procurement, fabrication, forwarding and shipping, insurance clearance, inland transportation, off-loading materials, storage and handling, construction including all construction materials, tools and equipment, special tools (if any), local purchasing and manpower, quality control, inspection and testing, pre-commissioning, commissioning and performance testing assistance of the facilities in the Medina Bulk Plant:


Scope of Work

  • External Floating Roof - 33.6x18 - Tank one (1) Nos. 15,960 m3
  • Cone Roof Tank -
    33.616.5 – two (2) Nos.
    14,630 m3 each
  • External Floating Roof – 30x18.5 – three (3) Nos. 13,077 m3 each
  • Internal Floating Roof - 16.5x16 – three (3) Nos. 3,412 m3 each
  • Cone Roof Tank –
    15.25x14 – two (2) Nos.
    2,557 m3 each
  • Cone Roof Tank 169 m3
    one (1) Nos.
  • Oily Water Sump Pump two (2) Nos. 682 m3/hr @ 22.4m
    Diff. Head
  • Firewater Pump – Diesel Engine Driven one (1) Nos. 340.9 m3/hr @105.8m Diff. Head
  • Firewater Pump – Motor Driven two (2) Nos. 340.9 m3/hr @105.8m Diff. Head
  • Diesel Loading Pumps five (5) Nos. 232 m3/hr @64m Diff. Head
  • Gasoline Loading Pumps five (5) Nos. 232 m3/hr @64m Diff. Head
  • Kerosene Loading Pumps two (2) Nos. 232 m3/hr @64m Diff. Head
  • Recovered Oil Transfer Pumps one (1) Nos. 116 m3/hr @54m Diff. Head
  • Firewater Fill Pumps two (2) Nos. 80 m3/hr @20m Diff. Head
  • Firewater Jockey Pumps two (2) Nos. 68.2 m3/hr @105.8m
    Diff. Head
  • Oily Water Sump Pumps two (2) Nos. 46 m3/hr @13m Diff. Head
  • Heel Recovery Transfer Pump one (1) Nos. 46 m3/hr @13m
    Diff. Head
  • Other Pumps four (4) Nos. ranging from 2.3 m3/hr with 3m Diff. Head to 17 m3/hr with 1379 kpa Diff. Head
  • Effluent Pump one (1) Nos.
    46 m310 HP
  • Fire Water/Raw Water System
  • Emergency Generator
  • Oily Water System
  • Foam Skids for product
    storage tanks
  • Truck Loading Racks
  • Infrastructure facilities
  • Foam skid for loading racks
  • Refueling Gasoline Dispenser Station
  • Two (2) New 33kV overhead lines
  • 380V Power Supply within Bulk Plant
  • A TETRA Mobile Radio System
  • In Plant Party Paging System
  • Civil / Buildings
    • Loading Pump Stations
    • Switchgear Building
    • Chemical Storage
    • Facilities buildings
    • Terminal Management System
    • Telecommunication facilities
    • Admin. Building
    • Control Building
Medina, Saudi Arabia
190 Millions
ARAMCO
Apr 01, 2005 to Jun 30, 2006
COMPLETED INDUSTRIAL
Aramco

Relief System & Flare Gas System Qatif - Progress 2020

   Relief System & Flare Gas System Qatif - Progress 2020

Watch Video...