Major Projects

Riyadh Power Plant No.9 Combined Cycle (5,980 MW)

The combined cycle plant (PP9) has been built on a site of 3.2 million square meter about 54km east of Riyadh. This construction, together with an expansion of the existing PP 9 facility, made Riyadh the largest crude oil-fired power plant in the world. Arabian Bemco Contracting Company was awarded the project by SEC. Works Started in 1995,

Riyadh Power Plant No.10 Combined Cyle (4,600 MW)

On June 30, 2008 Arabian Bemco was awarded a S.R 11 billion (USD 3 billion) contract with SEC for a turnkey supply and installationof a 2,600 MW power geneartion plant (PP10) built on an area of 5 million square meter outside the capital of Saudi Arabia, Riyadh.This is a Greenfield project that will initially install 36 GTG simple cycle base loaded gas turbines on

Qurayyah Combined Cycle Project (4,600 MW)

On June 11, 2007, Arabian Bemco was awarded a SR 2.1 billion (USD 570 Million) contract with SEC to build the 2,500 MW Qurrayah Open Cycle Power Plant in the Eastern Province of KSA. Under the engineering, civil construction and mechanical erection package, Arabian Bemco will install gas-fired turbines at the plant supplied by

Riyadh Power Plant No.12 Combined Cycle (2,175 MW)

On May 16, 2012, Arabian Bemco signed a S.R 4.7 billion contract (USD 1.3 billion) with the Saudi Electricity Company to build a Grass Root Combined Cycle Power Plant in Riyadh, Saudi Arabia. The plant is located 100 KM West of Riyadh City. Once completed, the new grass root combined cycle power plant (PP12) will produce


Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description
The work comprises a Design & Build package that includes, the provision of further design works to detail the existing conceptual design, the provision and construction of all foundations, structures, finishes, mechanical, electrical, sewage treatment, waste treatment, plumbing and specialist works and other equipment to provide complete and operationally capable facilities.


Scope of Work
Key components include:

  • 2 No. 66kV/11kV Substations and electrical power distribution system.
  • Potable/Fire water distribution system comprising <4kM of 400mm piping, 9460/pm & 3785/pm pumps, 2 No. 6800 m3
  • Pre-stressed concrete tanks 62,779 m3
  • Equalization Tank
    41,562 m3
  • Clarifier Tanks 3,996 m3
  • Aerobic Digester Tank
    859 m3
    Chlorination Tanks 494 m3
  • Waste water treatment plant, triturator for airside sewage, forced main waste water collection system and irrigation system.
  • Solid waste treatment plant comprising incinerators with air pollution controls and a bank of solid waste compactors.
  • Central utility plant of <28,000kW to supply/chilled water and emergency power <20,000 kW, housed in a 40mx106m single storey building of concrete and steel construction complete with 2 No. 15t overhead traveling cranes.
  • Engineering building of 2 stories, steel framed with irregular footprint (18mx45m) includes offices, control, rest end storage rooms, maintenance shops and employees canteen.
Doha, Qatar
2143 Million
New Doha Int. Airport Steering Committee
Jul 05, 2006 to Dec 15, 2008
ACTIVE INDUSTRIAL
Bechtel Inc. (including Project Mgt.)

Relief System & Flare Gas System Qatif - Progress 2020

   Relief System & Flare Gas System Qatif - Progress 2020

Watch Video...