Project Description
Scope of Work
The scope of work of this Lump sum Turnkey Project includes Engineering, Supply, Installation and Testing & Commissioning of 115 KV Substation
- 15 KV GIS
- 3 x 40 MVA Power Transformers
- 32 Breakers 13.8 KV MV Switchgear
- Protection & Control System
- Communication System
- SCADA System
- Electromechanical Works
- 5.5 KM Double Circuit Overhead Transmission Line
- Civil Work/Buildings
- GIS/Switchgear
- Building} 1,000 m2
- Medium Voltage/Control Building}