Project Description
Supply, Installation, Testing and Commissioning of 8 No. GE Gas Turbines, 60MW each (ISO 85MW each) All civil works including earth works, equipment foundations, renches,
Scope of Work
Supply and installation of electrical systems and equipment such as:
- 380 KV GIB modifications
- 380 KV Cables
- 380 KV Power Transformers
- 380 KV Transition Bus
- 132 KV GIB and Cables132 KV Power Transformer
- Auxiliary & station transformers.
- MV switchgear.
- LV switchgear.
- MV, LV & Control Cables.
- Control and Instrumentation cables
- Fire Fighting Systems.
- Gas System