Riyadh Power Plant No.9 Combined Cycle (5,980 MW)

The combined cycle plant (PP9) has been built on a site of 3.2 million square meter about 54km east of Riyadh. This construction, together with an expansion of the existing PP 9 facility, made Riyadh the largest crude oil-fired power plant in the world. Arabian Bemco Contracting Company was awarded the project by SEC. Works Started in 1995,

Riyadh Power Plant No.10 Combined Cyle (4,600 MW)

On June 30, 2008 Arabian Bemco was awarded a S.R 11 billion (USD 3 billion) contract with SEC for a turnkey supply and installationof a 2,600 MW power geneartion plant (PP10) built on an area of 5 million square meter outside the capital of Saudi Arabia, Riyadh.This is a Greenfield project that will initially install 36 GTG simple cycle base loaded gas turbines on

Qurayyah Combined Cycle Project (4,600 MW)

On June 11, 2007, Arabian Bemco was awarded a SR 2.1 billion (USD 570 Million) contract with SEC to build the 2,500 MW Qurrayah Open Cycle Power Plant in the Eastern Province of KSA. Under the engineering, civil construction and mechanical erection package, Arabian Bemco will install gas-fired turbines at the plant supplied by

Riyadh Power Plant No.12 Combined Cycle (2,175 MW)

On May 16, 2012, Arabian Bemco signed a S.R 4.7 billion contract (USD 1.3 billion) with the Saudi Electricity Company to build a Grass Root Combined Cycle Power Plant in Riyadh, Saudi Arabia. The plant is located 100 KM West of Riyadh City. Once completed, the new grass root combined cycle power plant (PP12) will produce


Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description


Scope of Work

Scope of works is the Design, Engineering, Material Procurement, Quality Management, Factory Inspection, Testing & Commissioning and all associated works and services until final handing over of heavy duty industrial package type, simple cycle combustion gas turbine generator plant. Standard proven design of gas turbine generators having a net rating of 60-80+10% MW base load at 50oC ambient temperature and reference site ambient conditions totaling approximately 1200 MW (60Hz units), shall be proposed. Crude oil is the main fuel with Natural gas as a back-up fuel and distillate for shut down and start-up. The proposal shall also include provisions for future conversion to Combined Cycle and Turbine Inlet Air Cooling System (TIAC). The scope shall include but not limited to the following:
Civil Works comprising but not limited to the following :

  • Site Preparation, fencing, soil investigation, buildings, foundations, roads.
  • Landscaping and related water system, underground networks and excavation.
  • Drainage and Sewage Systems.

Mechanical Works :

  • 20 Turbines - Generator packages and its accessories.
  • Fuel Gas System, Crude Oil and Diesel Oil Systems.
  • Re-commission of existing crude oil pipeline and metering station.
  • Compressed Air System, fire fighting and detection system.

Electrical Works:

  • Generator and Ancillaries, Transformers and 380 KV Gas Insulated Bus Ducts.
  • 132 KV Substation and step-up transformers.
  • Medium Voltage Switchgear and Low Voltage Switchgears.
  • DC, UPS Systems, Batteries, Battery charger and inverters.
  • Lighting, Earthing and Lightning Protection Systems.
  • Cables, Cable Laying and Terminations.
  • Electrical Protections, interlocking and Motor Control Centers.

Instrumentation & Controls :

  • Plant Control and Monitoring Systems and DCS
  • Plant Communication Works:
  • Telephone and PABX System and Public Address and Intercom System.
  • Radio Communication System and Clock System.
Riyadh, Saudi Arabia
2584 Millions
SEC-COA
March 14, 06 to Aug 1, 08
POWER GENERATION & TRANSMISSION
SEC

Relief System & Flare Gas System Qatif - Progress 2020

   Relief System & Flare Gas System Qatif - Progress 2020

Watch Video...