Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description
EPC grassroot project (1 million sq.m Site)

Scope of Work

  • Installation, Testing & Commissioning of 15 GTs Frame F (127 MW), 15 GSU, Unit Transformers, Bus Ducts & GCBs purchased from GE under separate contract with SEC.
  • Engineering, Supply, Installation, Testing & Commissioning MV Switchgears, DC Systems, LV Switchgears, Protection and Control, Diesel Generators, 4.5 Km Transmission Line, CCTV, PABX, Public Address Systems, Gas System, 4.5 Km Gas Line, Water Treatment Tanks, Fuel Systems, Closed Water Cooling Systems, Sewage Treatment Plant, Fire Fighting, Compressed Air System, Cranes, Workshop & Laboratory Equipment
  • Fuel Oil Tank 17,000 m3 x 3 Nos. Diesel Oil Fixed Roof Cone Type
  • De-Min Water Tank 4,500 m3 x 2 Nos. Fixed Roof Cone Type
  • Potable Water Tank 1,000 m3 x 1 No. Fixed Roof Cone Type
  • Fire Water Tank 13,500 m3 Fixed Roof Cone Type
  • De-Min Water Tank 2,200 m3 x 2 Nos. Fixed Roof Cone Type
  • Distilled Water Tank 3,500 m3 Raw Water Fixed Roof Cone Type
  • Potable Water Tank 1,400 m3 Fixed Roof Cone Type
  • Backfilling of the site by 2m, Site Preparation, Foundations, Buildings, Roads, Shelters, Tunnels, Trenches, Duct Banks, Housing, Electromechanical Services.
Qurayyah, Saudi Arabia
2138 Millions
SEC-EOA
Jun 11, 2007 to Aug 15, 2009
ACTIVE POWER & TRANSMISSION
Black & Veatch