Print
Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description


Scope of Work

  • Supply & Install one (1) 60,000 m3/hr. Vertical Circulating Water Pump, Drive Motor & All other accessories.
  • Remove one (1) each 2100 mm existing Rubber Lined Blind Flange from existing valve.
  • Supply & install one (1) each 2400 mm to 2100 mm Reducer and 2100 mm Expansion Joint.
  • Supply & Install two (2) Traveling Water Screens with Accessories.
  • Necessary modifications to the existing 480 V MCC and 4160V Switchgear & Provide & Install One (1) 1200A, 350MVA, 4160 C.B., Control Power Transformer (CPT), Potential Transformer (PT) Microprocessor Relay and Associated Accessories.
  • Replace the existing Circuit Breaker, Combination Starter and Control Devices, including Power Control Connections, in the existing 480V MCC, for the existing MOV,SW-008.
  • Replace the existing Circuit Breakers, Starters, Controls and Associated Accessories for the Space Heater.
  • Replace the existing Circuit Breakers, Combination Motor Starters, Controls and all Associated Accessories necessary for the operation and control of the two (2) New Traveling Water Screens.
  • All Associated Civil Works.
Yanbu, Saudi Arabia
21 Millions
Royal Commission
1998 To 2000
COMPLETED INDUSTRIAL
EPCON