Project Description
Scope of Work
The scope of work of this Project includes Engineering, Supply, Installation, Testing and Commissioning of 110 KV Substation as follows:
- 8 Bays 110 KV GIS
- 39 Breaker 13.8 KV Switchgear
- 3 Nos. 40 MVA 110/13.8kV Power Transformers
- 2 Nos. 40MVA 110/13.8kV Shunt Capacitors
- Protection & Control
- Auxiliary Systems
- Fire fighting
- Electromechanical works
- Civil Works/Buildings
- GIS/Switchgear
- Building} 1,000 m2
- Medium Voltage/Control Building}