Oil and Gas
BEMCO executed on EPC basis a large number of Oil and Gas projects related to pumping, transferring, metering, and storage of hydrocarbon products totaling more than 100 million gallons.
BEMCO is a General Contractor for construction works in Hydrocarbon Process Plants undertaking responsibility for civil, electrical, mechanical, erection, instrumentation, controls, piping, insulation, and painting.
Among the Oil and Gas projects executed for ARAMCO is the 519,000 Barrels Medinah Bulk storage facility, the PP9 200,000 BPDD crude oil pipeline that ties into the east-west Saudi ARAMCO 48 inch pipeline and a Flare Tank Project for Luberef.
Refrigeration
BEMCO executed on EPC basis a large number of central refrigeration and district cooling plants using technologies from centrifugal reciprocating and screw compression technologies to absorption technologies for application in HVAC, district cooling and Gas Turbines Inlet air-cooling (TIAC) facilities for Power Plants.
Among the refrigeration technology projects executed by BEMCO is Makkah and Madinah Haram (Over 35,000 TR), the Qatar District Cooling Plant #1 & 2 (Over 65,000 TR) and Gas Turbines Inlet air-cooling (TIAC) Plants in Jouba, Hail Power Plants (Over 10,000 TR), and PP9 (Over 50,000 TR).
Water
BEMCO executed on EPC basis numerous water treatment plants using Reverse Osmosis technologies for seawater and brackish water desalination as well as industrial and domestic waste water treatment plants. In addition, BEMCO has undertaken large water pumping transfer stations.
Among BEMCO’s list of projects is Boweib and Salboukh Reverse Osmosis Brackish water treatment plant (120,000 m3/day), Royal Commission sea water intake pumping stations (180,000 m3/day), King Khaled International Airport Waste Water Sewage Treatment Plant (10,000 m3/day).
|