Project Description
The scope of work includes Engineering, Procurement, Shipping, Insurance, Inland Transportation, Off-loading, materials, storage and handling, construction, quality control, inspection and testing, pre-commissioning, commissioning and performance testing assistance of the upgrade utility as LSTK (Lump Sum Turn Key) Saudi Aramco Contract.
Scope of Work
These facilities comprising mainly of one (1) 530,000 lb/hr High Pressure Steam Boiler, One (1) boiler feed pump, 24 inch steam header, 16 inch fuel gas header, one (1) boiler caustic feed pump, extend all utilities to new boiler location, modify HP plant master steam header, Provide vibration monitoring.